AL FARIS Power commissioning of Plant for Samsung C&T for Qurayyah IPP Saudi Arabia

WHY AL FARIS – Several supplier offered the temporary power solution but Al Faris was awarded the contract due to superior technical design and ability to Install the power system within project required time frame.

case2e1

SITUATION –  Qurayyah IPP (QIPP) is a large gas and fuel oil fired combined cycle power station. Samsung was Needed Temporary Power for the commissioning of QIPP Aucxilary system and the GT. The challenge is to supply, install and commissioning of DG power plant within time frame too meet site schedule of GT commissioning.

case2e123

OUR SOLUTION – With technical details and discussion team, Al Faris proposed 26 MW 13.8 KV 60Hz Power plant for commissioning activities of QIPP