THE CHALLENGE – Awarded to commission and provide solutions for lifting of various complex structures constructed at ground level weighing between 100 to 160 TONS and spanning between 2000M2 to 3500M2. The major challenge was calculation of lifting points and weight distribution on the multiple cranes used and thus proposing suitable cranes at each position.

OUR SOLUTION – By calculating load distributions at various lifting points and planned selection of appropriate cranes was used. A combination of 4 Liebherr mobile cranes was used; 2 x 250 TON mobile crane, 400 TON mobile crane and 500 TON Mobile crane with main boom and luffing jib combinations and successfully lifted the structures. Numerous site visits for designing and working in close conjunction with our valued customer to arrive at a custom designed and successfully engineered solution.